Brightsource / Negev Desert – Israel

CSP Concentrated Solar Power.

From the project to the verification of the manufacturing standards in the factory.

DATE: 2006/2008
TIMING: 2 YEARS

All the know-how acquired by ESE in the CSP sector, comes from a long experience in the power field.
For this assignment were commissioned the engineering and supervision for the realization of the receiver,
the part of the plant bound to receive concentrated solar energy,
to then be exchanged and converted in electric energy.

Besides the receiver design and engineering, Brightsource has assigned to ESE its follow up,and the punctual review of its manufacturing at the factorywith following supervision during assembly on work site.

PROJECT

Implementation of a pilot plant CSP (Concentrated Solar Power) in the Negev desert.

OBJECTIVE

Implementation of the 6 MW thermal Direct Steam Receiver component.

ANSWER

Transfer of traditional energy production know-how to solar thermal storage with molten salts.

A PROJECT REALIZED WITH THE CONTRIBUTION OF 1 STREAM CONSORTIUM COMPANY

Engineering services and supervision for the receiver realization.

RESULTS

Do you want to know everything we can do for you?