Menapy Italia / Ortona (CH)

8.69 MW photovoltaic plant.

Project assessment and start of preparatory activities for the opening of the construction site.

DATE: 08.2021
TIMING: 2 MONTHS

Menapy is an important Belgian reality and it deals with renewable energy investments. Through its controlled Menapy Italy, it’s developing a pipeline of realizations and acquisitions in the renewable field. For its consolidation within the Italian market through the Ortona project, Menapy Italy has chosenSTREAM as partner. The commissioned activities also included the supervision of third-party professionals, for the coordination of safety in the executive phase necessary for the construction site opening, located in a sensible area, with particular works which require the placing of structures in the ground to support the modules.

PROJECT

To realize an 8.69 MW photovoltaic plant, part of the investments in Italy by the Belgian fund Menapy.

OBJECTIVE

To review and approve the final electrical design, to coordinate works management and safety.

ANSWER

Owner’s Engineering, based on the experience of more than 2.000 photovoltaic plants designed.

A PROJECT REALIZED WITH THE CONTRIBUTION OF 2 STREAM CONSORTIUM COMPANIES

Supervision of the professionals in the field for works management and safety in the execution phase.

Owner’s engineer for the review of the final electrical design, in contradiction with EPC.

RESULTS

Do you want to know everything we can do for you?