Seri Lambro / Lambro Park – Milan (Italy)

Mini hydro plant.

From the start of the works to the commissioning.

DATE: 11.2020
TIMING: 6 MONTHS

Implementation of a 90 kW mini hydro power plant with hydraulic screw, located in the Lambro Park, at the heart of the city of Milan on the right bank of the homonymous river, capable to take advantage of the jump offered by the existing weir.
The work also provided for the strengthening of the same weir and the realization of a special fish climbing ladder, able to permit the passage of aquatic fauna between the two river stretches.
The plant has been thought to produce 500.00 kWh/a, and it constitutes the first of a series of production assets which Seri Lambro has chosen to develop in cooperation with STREAM.

PROJECT

Implementation of mini hydro plant for the production of electric energy on the Lambro river.

OBJECTIVE

Establishment of a asset management company with interest in renewable energy.

ANSWER

To propose a technical partnership for the project development, in a broader development program.

A PROJECT REALIZED WITH THE CONTRIBUTION OF 2 STREAM CONSORTIUM COMPANIES

Development of authorization procedures, hydraulic design, selection of the suppliers and site management.

Electrical design and selection of suppliers.

RESULTS

Do you want to know everything we can do for you?