Aruba / Ponte San Pietro – Bergamo (Italy)

Global Data Center.

From the feasibility study to the executive project.

DATE: 03.2020
TIMING: 1 YEAR

According to its sustainable environmental objectives, Aruba, the European leader in data center and web hosting services, has entrusted the STREAM Consortium with the modernization and upgrading of its Global Cloud Center of Ponte San Pietro (BG), the biggest in Italy.
Through the STREAM companies in charge for the project, the modernization of the two existing production groups and the insertion of a third one have been studied, along with the revamping of the hydraulic works and hydromechanics and the renovation of the control, regulation and supervision electric and electronic equipment.

PROJECT

Repowering the Aruba Global Data Center.

OBJECTIVE

To reduce the data center dependence from traditional energy sources.

ANSWER

Internal multidisciplinary team to study and design the actions to be taken.

A PROJECT REALIZED WITH THE CONTRIBUTION OF 3 STREAM CONSORTIUM COMPANIES.

Hydraulic design and order project management.

Final and executive electric design.

Final and executive civil design.

RESULTS

Do you want to know everything we can do for you?