Solarfarm88 / Castelletto di Branduzzo – Pavia (Italy)

7.84 MW photovoltaic plant.

From the feasibility study to the obtainment of authorizations.

DATE: 10.2021
TIMING: 9 MONTHS

Technical, economical and environmental feasibility study for the implementation of a photovoltaic plant grounded in an industrial area, already partially destined to the possible realization of a warehouse.
Diverse simulations were conducted with iterative process, which have involved geometrical (layout), plant (PVsyst) and economical (business plan) parameters to determine the optimal installable power on available areas, maximizing the plant manufacturability.
Once identified the optimal solution of 7.84 MW, the engineering team, coordinated by a job project manager, set up for the newly created SPV (Special Purpose Vehicle) Solarfarm88 Ltd. the required administration for the authorization procedures regarding a plant of this kind.

PROJECT

To realize a photovoltaic plant on industrial plots of property land.

OBJECTIVE

To increase the Group investments in green economy.

ANSWER

To present an engineering multidisciplinary team capable to develop and realize the new plant.

A PROJECT REALIZED WITH THE CONTRIBUTION OF 3 STREAM CONSORTIUM COMPANIES

Feasibility study, authorization process and job order project management with the coordination of internal resources and third-party professionals in the field.

Preliminary and detailed electrical design, plant implementation and connection procedures to the power grid.

Review of steel structures, engineering and administrative procedures of civil works, metric computation, civil engineering paperwork, review of final layout and respect of urban planning restrictions.

RESULTS